
1
1451 Belcher Road South, Largo, FL 33773 • USA
• Tel
+1 (727) 447-6140 • Fax (727) 442-5699 •
[email protected]FB-3500 Bi-Directional Insertion Electromagnetic Flow Meter Manual 05/14 - 0718-3 Page 25
4.3 START-UP AND COMMISSIONING WORKSHEET
Please read all installation instructions carefully prior to proceeding with these steps. Use the
following worksheet for checking off the commissioning steps and recording measured values.
Steps 9 - 12 require ow in the pipe. Flow signal readings should be taken while holding
the ow rate constant, if possible. Otherwise, take the various output readings as quickly as
possible.
STEP TEST/MEASUREMENT S/N: _________ S/N: ________ S/N: ________ S/N: _________
1. Meter location:
2.
Conrm pipe size:
3. Insertion depth
and orientation:
4. Control system
programming:
5. Match display or Btu
meter serial number
(S/N) if ordered:
6. Signal connections
veried:
7. Supply voltage veried:
8. Connect power:
The following steps require ow in the pipe. Flow signal readings should be taken while holding the ow rate
constant if possible. Otherwise, take the various output readings as quickly as possible.
9. Flow direction indicator
changes state (Y/N)
10. Frequency output(s):
Avg = green
Average frequency (Hz):
Average frequency
(VDC):
Calculated ow rate:
___________Hz
_________VDC
_________GPM
___________Hz
_________VDC
_________GPM
___________Hz
_________VDC
_________GPM
___________Hz
_________VDC
_________GPM
11. Analog or pulse
output(s)
4-20 mA signal:
0-5 / 0-10 V signal:
Scaled output interval:
Calculated ow rate:
___________mA
_________VDC
_____________
_________GPM
___________mA
_________VDC
_____________
_________GPM
___________mA
_________VDC
_____________
_________GPM
__________mA
_________VDC
_____________
_________GPM
12. Flow rate displayed
by control system:
_________GPM _________GPM _________GPM _________GPM
Commentaires sur ces manuels